Kitchen renovations in Oxford County
A kitchen that's dark and closed in, cabinets that are falling apart, or a layout that never worked. We connect you with a local contractor who renovates kitchens across Woodstock and Oxford County.
- Serving Woodstock, Ingersoll, Tillsonburg and all of Oxford County.
- No fee to us. You only pay for the work itself.
What a full renovation includes
- Design and layout. Where the sink, range, fridge and island go, how much counter and storage you get, and how people move through the room.
- Demolition. Old cabinets, counters and flooring out, and sometimes a wall between the kitchen and dining room.
- Rough-ins. Plumbing, electrical and venting moved or added for the new layout: new circuits, an island sink, a range hood vented outside.
- Walls and ceiling. Drywall repairs, new pot lights and paint.
- Cabinets, counters and backsplash, installed and templated in order.
- Flooring, usually before the cabinets go in.
- Final connections. Sink, faucet, dishwasher, range and lighting hooked up.
Opening up the kitchen
Taking out the wall between the kitchen and the living or dining room is one of the most common requests in older Oxford County homes. If the wall is load-bearing, it needs a beam sized by an engineer or designer, and a building permit. Plumbing, ducts or wiring inside the wall also have to be rerouted. A contractor can tell you quickly whether it's a simple job or a big one.
How long it takes
Most full kitchen renovations take a few weeks of work on site, plus lead time for cabinets and counters, which are often ordered weeks ahead. Counters are measured after the cabinets are installed, so there's usually a gap of a week or two before they arrive. Plan for a temporary kitchen somewhere else in the house.
Permits
Replacing cabinets and counters in the same layout usually doesn't need a permit. Removing walls, moving plumbing and new wiring usually do, and electrical work needs an ESA permit. Read our kitchen permit guide.
Questions
How long does a kitchen renovation take?
Usually a few weeks of work on site once materials are ready. Cabinet and counter lead times often add several weeks before work starts, so get the order placed early.
Can I live at home during the renovation?
Most people do. Set up a temporary kitchen with the fridge, a microwave and a kettle in another room, and expect dust and noise during the day.
Can you remove the wall to the dining room?
Often, yes. If it's load-bearing, it needs a properly sized beam and a building permit. The contractor will check what's in the wall first.
Should I renovate before selling?
A full renovation rarely pays back fully on sale. Painting cabinets, new counters and hardware often give more return for less money if you're selling soon.
Renovations near you
Kitchen renovations across Oxford County. Pick your town for local details.
Other kitchen work we can connect you with
Kitchen cabinets
New cabinets in stock, semi-custom or custom lines, plus refacing and hardware upgrades, installed level and square.
Learn moreCountertops
Quartz, granite, butcher block and laminate counters, templated, cut and installed, with sinks and backsplashes.
Learn moreBacksplashes & smaller updates
New backsplash tile, sinks and faucets, lighting, hardware and appliance changes: a fresh kitchen without a full renovation.
Learn more